The prices of "Asia Stroy Innovation" LLP
Work description |
Unit of measure |
Price |
Complete construction of cottages and houses on turnkey basis |
М2. |
from 370$ |
Complete construction of non-high-rise buildings and structures with no complex configuration |
М2. |
From 400$ |
Complete construction of high-rise buildings and structures with complex configuration |
М2. |
From 590$ |
Set of works on the service: "Cosmetic repair" Dismantling: · 2) Skirting boards · 3) Quips · 4) Electrical appliances · 5) Surface preparation Installation: · 1) Chalk ground + primer + ceiling roll up · 2) Installation + hollow chamfer sealing · 3) Wallpapering or wall rolling · 4) Fitting skirting boards · 5) Installation of electrical appliances |
М2 |
From 50$ |
Dismantling: 1) Electricity 2) Bathroom fixtures 3) All old furnishings Installation: 1) Electricity 2) Bathroom fixtures 3) Floor cement screed 4) Gypsum plasterboard work 5) Chalk ground + primer + ceiling roll up 6) Chalk ground + primer + sanding of walls 7) Installation of ceramic tiles (tiles) 8) Installation and sealing of hollow chamfer 9) Wallpapering (vinyl) or seaming 10) Installation of laminate or linoleum 11) Installation of the skirting boards 12) Garbage removal |
М2 |
From 100$ |
Set of works on the service: "PREMIUM"
|
М2 |
From 300$ |
Gypsum board wall installation 1 layer |
М2 |
1500 |
Gypsum board wall installation 2 layers |
М2 |
2200 |
Gypsum board partitions installation 1 layer |
М2 |
2500 |
Gypsum board partitions installation 2 layers |
М2 |
2900 |
Gypsum board slope installation |
RM |
2000 |
Cementing of walls for painting |
М2 |
1600 |
Wall plastering for wallpaper |
М2 |
1200 |
Filling of walls for fiberglass |
М2 |
1200 |
Puttying of the slopes for painting |
М2 |
1500 |
Wall priming |
М2 |
250 |
High-quality wall painting |
М2 |
600 |
Coloring high-quality slopes |
М2 |
600 |
Glueing wallpaper on walls |
М2 |
From 800 |
Wallpaper of two colors or (and) with a picture |
М2 |
From 1000 |
Glueing silk-screen wallpaper |
М2 |
1200 |
Glueing specific wallpaper (expensive, natural, textile, photo, etc.) |
М2 |
1500 |
Curb hooping |
RM |
1000 |
Glueing non-woven wallpaper for painting |
М2 |
700 |
Glueing non-woven fleece wallpaper |
М2 |
700 |
Glueing glass fiber wallpaper |
М2 |
1100 |
Glueing wallpapers on slopes, facets of beams and columns |
RM. |
1200 |
Coating of high-quality walls (layer thickness of up to 25mm) |
М2 |
1600 |
Coating of high-quality slopes |
М2 |
3000 |
Wall tiling |
М2 |
From 2500 |
Covering walls and floors with mosaic |
М2 |
4500 |
Wall tiling without open seams |
М2 |
3000 |
Facing with tiles 10х10 |
М2 |
2500 |
Facing the tiled walls with a seam under 45 * |
М2 |
3500 |
Laying a flat curb (for each addition rm) |
RM |
2000 |
Laying a protruding curb (for each addition rm) |
RM |
2500 |
Decorative border made with mosaic |
RM |
2000 |
Hole in the tile |
Pcs |
1200 |
An external corner of a tile with a milling of edges under 45 * |
М2 |
2000 |
An external corner of a tile with trim mounting |
М2 |
2000 |
Facing with rubble stone |
М2 |
4000 |
Laying brick partitions 0,5 brick. |
М2 |
4500 |
Aligning the walls (dry mix) |
М2 |
1600 |
Alignment of slope planes (dry mix) |
М2 |
2000 |
Installation of wall panels |
М2 |
2000 |
Installation of insulation on the walls (thickness of 50mm) |
М2 |
500 |
Installation of perforated corner |
RM |
800 |
Setting up gypsum boards |
RM |
2000 |
Decorated board installation |
М2 |
1500 |
Pasting walls with fiberglass |
М2 |
1500 |
Brick laying, thickness from 250 to 1000mm |
М3 |
From 11000 |
Placing gas block partitions, thickness 100mm |
М2 |
2500 |
Placing brick partitions 1/2 brick. |
М2 |
3000 |
Decorative plastering |
М2 |
From 3500 |
Pasting of walls with a cork, PVC tiles |
М2 |
2000 |
Finishing wall lining in rooms of up to 15m2 (bathroom, balcony) |
М2 |
2500 |
Wall decoration in rooms>25m2 |
М2 |
2000 |
Arrangement of slopes from the lining |
RM |
1500 |
Drenching or varnishing of the lining, the floorboard on two layers |
М2 |
450 |
Installation of gypsum board ceiling with a design |
M2 |
From 3000 |
Installation of gypsum board ceiling |
M2 |
From 1700 |
Strengthening the end face of the gypsum board ceiling for stretch ceiling |
RM |
1000 |
A direct niche for internal illumination |
RM |
2000 |
Curved niche for internal illumination |
RM |
3500 |
A direct niche for curtains in the gypsum board ceiling |
RM |
3000 |
A curved niche for curtains in the gypsum board ceiling |
RM |
4000 |
Ceiling for glass fiber liners |
M2 |
1200 |
Ceiling for painting |
M2 |
1700 |
Painting of high-quality ceiling |
M2 |
600 |
Ceiling with wallpaper |
M2 |
800 |
Ceiling with a fiberglass |
M2 |
1000 |
Installation of a ceiling skirting, polystyrene or semiurethane up to 45 mm |
RM |
From 400 |
Installation of polyurethane skirting board with a height of 45-125 mm, moldings to the wall |
RM |
800 |
Installation of polyurethane skirting board with a height of more than 125 mm |
RM |
900 |
Installation of columns of flat polyurethane |
RM |
1200 |
Painting of columns |
RM |
600 |
Painting ceiling skirting in a single with a ceiling color |
M2 |
550 |
Painting ceiling skirting in a color different from the ceiling, wall moldings |
M2 |
600 |
Aligning the surface of ceilings (dry mix) |
M2 |
1500 |
Installation of floating ceiling Armstrong |
M2 |
1200 |
Finishing the lining of ceilings in the premises |
M2 |
1800 |
Cement-sand screed, thickness of up to 5cm |
M2 |
1500 |
Tiling of the floor |
M2 |
From 2500 |
Facing the floor tiling, French and under 45 * |
M2 |
3500 |
Laminate laying |
M2 |
1500 |
Laying of laminate, locked corks |
M2 |
1500 |
Laying of parquet board |
M2 |
1800 |
Laying a massive board on plywood |
M2 |
1800 |
Laying of laminate at an angle of 45 * on the finished base |
M2 |
2000 |
Floor covering with glue stopper, PVC tile |
M2 |
1800 |
Covering the glue cork with varnish with 2 layers |
M2 |
1000 |
Carpeting, linoleum flooring |
M2 |
650 |
Wooden board flooring |
M2 |
2200 |
Wooden board flooring by floor joists on balconies |
M2 |
3000 |
Installation of shelves |
M2 |
3500 |
Installation of skirting boards (plastic) |
RM |
200 |
Installation of wooden plinths |
RM |
450 |
Mounting of polyurethane skirting boards |
RM |
350 |
Plywood flooring on logs |
M2 |
1500 |
Plywood flooring on logs with 2 layers with sizing |
M2 |
2200 |
Plywood flooring on a flat surface without lag |
M2 |
1400 |
Plywood grinding with dust removal |
M2 |
1400 |
Installation of interior doors |
Pcs |
8000 |
Installation of an entrance metal door |
Pcs |
12000 |
Placing dry floors DRY WALLS |
М2 |
1800 |
Figured tile cutting |
RM |
2300 |
Facing the floor with ceramic granite |
M2 |
3000 |
Leveling floors with "levelers" |
M2 |
500 |
Flooring of commercial linoleum |
M2 |
700 |
Welding joints of commercial linoleum |
RM |
450 |
Installation of accessories in the bathroom |
Pcs |
1000 |
Installation of ventilation grilles |
Pcs |
1000 |
Installation of rectilinear curtains |
Pcs |
1200 |
Installation curved curtains |
Pcs |
2500 |
Mounting the door stop |
Pcs |
600 |
Dismantling of brick walls (chiselling) |
М3 |
15000 |
Dismantling of concrete walls (chiselling) |
М3 |
25000 |
Dismantling of concrete (mortar) screed thickness of up to 5cm |
М3/М2 |
20000/3200 |
Removing of plaster |
M2 |
800 |
Making whole in brick (not bearing). |
M2 |
6500 |
Making whole in a brick (bearing) |
M2 |
14000 |
Making whole in concrete (not bearing). |
M2 |
15000 |
Making whole in concrete (bearing) |
M2 |
28000 |
Garbage removal without elevator |
М3 - floor |
3500 |
Dismantling the window - door unit |
Pcs |
1200 |
Dismantling of walls of aerated concrete, gypsum, dry wall. Up to 100mm |
M2 |
1900 |
Wallpaper removal |
M2 |
200 |
Eliminating whitewash |
M2 |
350 |
Linoleum dismantling |
M2 |
150 |
Dismantle of tiles |
M2 |
600 |
The placement of niches for radiators in a brick wall |
M2 |
3000 |
The placement of niches for radiators in a concrete wall |
M2 |
9000 |
Dismantling the boardwalk |
M2 |
900 |
Dismantling works with preservation of the material structure |
M2 |
40-50% of construction works |
Complex electrical work for rough premises |
M2 |
3000 |
Making holes for sockets / switch / and installation |
Pcs |
800 |
Wall chasing of brick and plaster walls (section of up to 2.5cm) |
RM |
600 |
Installation of machines in the panel |
Pcs |
15000 |
Wall chasing of concrete walls section up to 2.5 cm |
RM |
600 |
Wall chasing of gypsum and foam concrete walls section up to 2.5 cm |
RM |
400 |
Hanging chandelier |
Pcs |
5000 |
Installing the spotlights |
Pcs |
750 |
Wire / TV cable |
RM |
300 |
Power cable wiring 220 volts |
RM |
300 |
Cabling and box installation |
Pcs |
500 |
Installation of pin-up lamp and lighting fixtures |
Pcs |
3500 |
Textured plaster for the facade |
M2 |
from 5500 |
Bayrami production of Kaiser, Mustang, Alina made in Kazahstan |
M2 |
4500 |
Art painting of walls and ceilings |
M2 |
from 40000 |
Venetian plaster made in Italy, Israel, Germany |
M2 |
from 5800 |
3D image from the complexity of work |
M2 |
from 25000 |
Gilding and brass leaf |
RM |
5000 |
Mural (Russia) (the minimum order is 10 sq.m.) |
RM |
from 60000 |
Imitation of old and ancient walls |
RM |
5500 |
Plaster Leonardo |
RM |
4500 |
Polychrome coating |
RM |
3000 |
Furniture and Glass Painting |
Pcs |
negotiable |
Dismantling the bath |
Pcs |
5000 |
Installing the bathtub |
Pcs |
8000 |
Toilet seat installation |
Pcs |
6000 |
Installation of a washbasin with a cabinet |
Pcs |
8000 |
Installing a kitchen sink |
Pcs |
5000 |
Mixer Tap Installation |
Pcs |
3000 |
Installing the washing machine |
Pcs |
4000 |
Wall chasing for the distribution of sewage pipes and water supply |
RM |
3000 |
Manufacturing and installation of metal-plastic windows and doors (White) |
M2 |
From 18000 |
French stretch ceilings |
M2 |
From 2500 to 4500 |
Custom-made furniture |
RM |
from 45000 |
Garbage removal |
Т |
3820 |
Surface cleaning of buildings, premises |
M2 |
from 650 |
Detailed cleaning of buildings, premises |
M2 |
from 1200 |
Cleaning nearby territory with equipment |
Pcs |
negotiable |
Stacking marble |
М2 |
8000 |
Granite laying |
М2 |
7000 |
Laying travertine |
М2 |
7000 |
Artistic styling of marble |
М2 |
From 12000 |
Grinding, polishing and crystallization of marble and granite |
М2 |
From 6000 |
3D grouting and decorative floor |
М2 |
From 25000 |
Pouring of polymeric and industrial floors (from marble chips) |
М2 |
From 5000 |
Construction works
Breakdown of axes of foundations and elevations |
M2 |
from 400 |
Developing ground coat manually |
M3 |
from 6000 |
Cutting of a vegetative layer by the bulldozer up to 250мм |
M3 |
from 2000 |
Ground development by equipment with loading onto vehicles |
M3 |
from 2000 |
Transportation of the developed soil to the dump by truck |
M3 |
1700 |
Development of soil by equipment in the dump |
M3 |
900 |
Backfilling of soil with layered tamping (backfilling of sinuses) |
M3 |
1900 |
Arrangement of rubble bases manually with tamping and watering |
M3 |
2500 |
Arrangement of sandy bases manually with ramming and watering |
M3 |
1300 |
Concrete preparation |
M3 |
from 5500 |
Cement-sand screed thickness of up to 50mm |
M2 |
from 2200 |
Constructional form |
M2 |
from 700 |
Laying of concrete mix in a structure |
M3 |
from 7000 |
Installation of foundation blocks |
Psc |
from 1500 |
Installation of reinforced concrete foundation pillows |
Psc |
from 1500 |
Waterproofing by lubrication |
M2 |
from 600 |
Installation of floor slabs |
Psc |
from 5000 |
Preparation of the solution by hand using a "mixer" |
M3 |
from 4000 |
Welding of reinforcing bars and metal structures |
Т. |
from 60000 |
Horizontal waterproofing, 2 layers |
M2 |
from 1600 |
Guided waterproofing, 1 layer |
M2 |
from 800 |
Guided waterproofing, 2 layers |
M2 |
from 1600 |
Vertical waterproofing, 2 layers |
M2 |
2500 |
Plastering horizontal waterproofing, 2 times |
M2 |
700 |
Plastering vertical waterproofing, 2 times |
M2 |
900 |
Waterproofing from a polyethylene film, 1 layer |
M2 |
150 |
Installation of extruded polystyrene on a vertical surface of up to 50 mm thick |
M2 |
1000 |
Installation of extruded polystyrene on a horizontal surface |
M2 |
500 |
Wall masonry with claydit or gas block with a thickness of 300mm |
М3 |
from 6500 |
Wall masonry with claydit or gas block with a thickness of 200mm |
M2 |
from 2300 |
Wall masonry with claydit or gas block with a thickness of 100mm |
M2 |
from 2000 |
Brick masonry of walls from 380 mm |
М3 |
from 9000 |
Masonry of brick columns 380 * 380mm |
RM |
from 10000 |
Masonry made of cladding brick |
M2 |
from 5500 |
Masonry partitions 1 / 2 brick |
M2 |
from 2500 |
Laying the insulation in an efficient masonry |
M2 |
400 |
Masonry of external walls made of bricks with insulation and facing brick (380 + 100 + 120) |
M3 |
from 13500 |
Masonry of external walls made of bricks with insulation and facing brick (510 + 100 + 120) |
M3 |
from 14000 |
Masonry of external walls with claydit or gas block with facing brick (300 + 120mm) |
M3 |
from 14500 |
Masonry of external walls with claydit or gas block with facing brick (400 + 120mm) |
M3 |
from 14500 |
Masonry of external walls with claydit or gas block with facing brick (500 + 120mm) |
M3 |
from 12000 |
Masonry of external walls with claydit or gas block thickness of 200 mm with matting - 100, air drain -50mm and siding as facing 120mm (200+100+50) |
M3 |
from 14000 |
Siding installation |
M2 |
2800 |
Wall cladding with natural stone |
M2 |
from 4000 |
Installation of lintel blocks of reinforced concrete |
Pcs |
550 |
Facing facade with travertin |
M2 |
from 6000 |
A roof from metal (timber construction, a lath, a flooring of a metal tile) |
М2 |
from 3000 |
The construction of the roof of soft tiles (rafter constructions, counter lath, even lath, installation of tiles) |
М2 |
from 4500 |
Roofing with stainless steel sheet (rafter constructions, lath, stainless steel sheet installation) |
М2 |
from 3800 |
Matting of the attic floor (steam-insulating works, insulation, hydro-wind protection) |
М2 |
from 1000 |
Matting of the attic roof (steam-insulating works, insulation, hydro-wind protection) |
М2 |
from 1000 |
Installation of rafter construction |
М2 |
from 3000 |
Installing the counter cladding |
М2 |
1000 |
Mounting the wall plate |
RM |
from 1200 |
Mounting of continuous cladding |
М2 |
from 1800 |
Installation of vapor barrier |
М2 |
180 |
Installation of moisture-and-wind insulation |
М2 |
350 |
Installation of a basalt insulation with a density of 35-50 kg / m3 in the inter-rafter space |
М2 |
900 |
Installation of metal tile |
М2 |
from 800 |
Installation of flexible tiles |
М2 |
from 2500 |
Installation of the cornice binder (width from 100 to 500mm) |
RM |
from 2000 |
Installation of drainage system (at a cornice height of up to 6 m) |
RM |
from 1500 |
Mounting of passages for pipes and fans |
RM |
from 4000 |
Installation of attic windows |
M2 | From 15000 |
Repair and restoration works of cultural and historical monuments (Depending on the author's assignment) |
Pcs |
negotiable |
Partial restoration of facades, roofs (architecture) |
М2 |
From 35$ |
Hydrojet cleaning of metal structures |
М2 |
from 1080 |
Mechanical cleaning of metal structures |
М2 |
from 520 |
Application of primer |
М2 |
from 540 |
Surface painting by airless method (m2 - 1 coat of paint) |
М2 |
from 700 |
Coloring the surface with a hand tool (m2 - 1 coat of paint) |
М2 |
from 1200 |
Full anti-corrosion paint |
М2 |
from 3000 |
Welding works |
Pcs |
договорная |
Mechanical cutting of metals at high altitude |
Pcs |
договорная |
Gas cutting of metals at high altitude |
Pcs |
договорная |
Drilling holes in metals (pcs.) |
Pcs |
договорная |
Complete sealing of inter-panel seams |
RM |
from 780 |
Integrated sealing of windows |
RM |
from 900 |
Opening of the old sealant |
RM |
from 300 |
Opening of cement mortar |
RM |
from 300 |
Degreasing the surface |
RM |
from 500 |
Removal of mold and fungus |
RM |
from 750 |
Stacking insulation |
RM |
from 225 |
Installing the hydraulic lock |
Pcs |
from 2000 |
Application of sealant |
RM |
from 420 |
Complete cleaning of the roof (high pressure washing) |
М2 |
from 680 |
Trimming of gutters |
RM |
1320 |
Cleaning large debris |
М2 |
1030 |
Washing of vertical glasses |
М2 |
from 300 |
Cleaning of horizontal glasses |
М2 |
from 410 |
Cleaning of hard-to-reach glasses |
М2 |
from 540 |
Cleaning of heavily soiled glass 1 (meter2) |
М2 |
from 500 |
Cleaning of especially dangerous glasses 2 (sq. m.) |
М2 |
from 850 |
Cleaning of the facade by hand (smooth and slightly soiled surfaces) |
М2 |
from 460 |
Washing the facade with a high-pressure cleaner |
М2 |
from 560 |
Washing of the facade with acid-alkaline agents |
М2 |
from 1350 |
Cleaning of metal surfaces |
М2 |
From 2500 |
Cleaning of production premises |
М2 |
From 3000 |
Cleaning of tanks and pipes |
М2 |
From 1800 |