The prices of "Asia Stroy Innovation" LLP

Set of services

Work description

Unit of measure

Price

Complete construction of cottages and houses on turnkey basis

М2.

from 370$

Complete construction of non-high-rise buildings and structures with no complex configuration

М2.

From 400$

Complete construction of high-rise buildings and structures with complex configuration

М2.

From 590$

Set of works on the service: "Cosmetic repair"

Dismantling:
1) Wallpaper

· 2) Skirting boards

· 3) Quips

· 4) Electrical appliances

· 5) Surface preparation

Installation:

· 1) Chalk ground + primer + ceiling roll up

· 2) Installation + hollow chamfer sealing

· 3) Wallpapering or wall rolling

· 4) Fitting skirting boards

· 5) Installation of electrical appliances

М2

From 50$

Dismantling:

1) Electricity

2) Bathroom fixtures

3) All old furnishings

Installation:

1) Electricity

2) Bathroom fixtures

3) Floor cement screed

4) Gypsum plasterboard work

5) Chalk ground + primer + ceiling roll up

6) Chalk ground + primer + sanding of walls

7) Installation of ceramic tiles (tiles)

8) Installation and sealing of hollow chamfer

9) Wallpapering (vinyl) or seaming

10) Installation of laminate or linoleum

11) Installation of the skirting boards

12) Garbage removal

М2

From 100$

Set of works on the service: "PREMIUM"

  • Design of the project
  • Author's supervision
  • Exclusive materials

М2

From 300$

Walls, partitions, slopes

Gypsum board wall installation 1 layer

М2

1500

Gypsum board wall installation 2 layers

М2

2200

Gypsum board partitions installation 1 layer

М2

2500

Gypsum board partitions installation 2 layers

М2

2900

Gypsum board slope installation

RM

2000

Cementing of walls for painting

М2

1600

Wall plastering for wallpaper

М2

1200

Filling of walls for fiberglass

М2

1200

Puttying of the slopes for painting

М2

1500

Wall priming

М2

250

High-quality wall painting

М2

600

Coloring high-quality slopes

М2

600

Glueing wallpaper on walls

М2

From 800

Wallpaper of two colors or (and) with a picture

М2

From 1000

Glueing silk-screen wallpaper

М2

1200

Glueing specific wallpaper (expensive, natural, textile, photo, etc.)

М2

1500

Curb hooping

RM

1000

Glueing non-woven wallpaper for painting

М2

700

Glueing non-woven fleece wallpaper

М2

700

Glueing glass fiber wallpaper

М2

1100

Glueing wallpapers on slopes, facets of beams and columns

RM.

1200

Coating of high-quality walls (layer thickness of up to 25mm)

М2

1600

Coating of high-quality slopes

М2

3000

Wall tiling

М2

From 2500

Covering walls and floors with mosaic

М2

4500

Wall tiling without open seams

М2

3000

Facing with tiles 10х10

М2

2500

Facing the tiled walls with a seam under 45 *

М2

3500

Laying a flat curb (for each addition rm)

RM

2000

Laying a protruding curb (for each addition rm)

RM

2500

Decorative border made with mosaic

RM

2000

Hole in the tile

Pcs

1200

An external corner of a tile with a milling of edges under 45 *

М2

2000

An external corner of a tile with trim mounting

М2

2000

Facing with rubble stone

М2

4000

Laying brick partitions 0,5 brick.

М2

4500

Aligning the walls (dry mix)

М2

1600

Alignment of slope planes (dry mix)

М2

2000

Installation of wall panels

М2

2000

Installation of insulation on the walls (thickness of 50mm)

М2

500

Installation of perforated corner

RM

800

Setting up gypsum boards

RM

2000

Decorated board installation

М2

1500

Pasting walls with fiberglass

М2

1500

Brick laying, thickness from 250 to 1000mm

М3

From 11000

Placing gas block partitions, thickness 100mm

М2

2500

Placing brick partitions 1/2 brick.

М2

3000

Decorative plastering

М2

From 3500

Pasting of walls with a cork, PVC tiles

М2

2000

Finishing wall lining in rooms of up to 15m2 (bathroom, balcony)

М2

2500

Wall decoration in rooms>25m2

М2

2000

Arrangement of slopes from the lining

RM

1500

Drenching or varnishing of the lining, the floorboard on two layers

М2

450

Ceiling

Installation of gypsum board ceiling with a design

M2

From 3000

Installation of gypsum board ceiling

M2

From 1700

Strengthening the end face of the gypsum board ceiling for stretch ceiling

RM

1000

A direct niche for internal illumination

RM

2000

Curved niche for internal illumination

RM

3500

A direct niche for curtains in the gypsum board ceiling

RM

3000

A curved niche for curtains in the gypsum board ceiling

RM

4000

Ceiling for glass fiber liners

M2

1200

Ceiling for painting

M2

1700

Painting of high-quality ceiling

M2

600

Ceiling with wallpaper

M2

800

Ceiling with a fiberglass

M2

1000

Installation of a ceiling skirting, polystyrene or semiurethane up to 45 mm

RM

From 400

Installation of polyurethane skirting board with a height of 45-125 mm, moldings to the wall

RM

800

Installation of polyurethane skirting board with a height of more than 125 mm

RM

900

Installation of columns of flat polyurethane

RM

1200

Painting of columns

RM

600

Painting ceiling skirting in a single with a ceiling color

M2

550

Painting ceiling skirting in a color different from the ceiling, wall moldings

M2

600

Aligning the surface of ceilings (dry mix)

M2

1500

Installation of floating ceiling Armstrong

M2

1200

Finishing the lining of ceilings in the premises

M2

1800

Floors

Cement-sand screed, thickness of up to 5cm

M2

1500

Tiling of the floor

M2

From 2500

Facing the floor tiling, French and under 45 *

M2

3500

Laminate laying

M2

1500

Laying of laminate, locked corks

M2

1500

Laying of parquet board

M2

1800

Laying a massive board on plywood

M2

1800

Laying of laminate at an angle of 45 * on the finished base

M2

2000

Floor covering with glue stopper, PVC tile

M2

1800

Covering the glue cork with varnish with 2 layers

M2

1000

Carpeting, linoleum flooring

M2

650

Wooden board flooring

M2

2200

Wooden board flooring by floor joists on balconies

M2

3000

Installation of shelves

M2

3500

Installation of skirting boards (plastic)

RM

200

Installation of wooden plinths

RM

450

Mounting of polyurethane skirting boards

RM

350

Plywood flooring on logs

M2

1500

Plywood flooring on logs with 2 layers with sizing

M2

2200

Plywood flooring on a flat surface without lag

M2

1400

Plywood grinding with dust removal

M2

1400

Installation of interior doors

Pcs

8000

Installation of an entrance metal door

Pcs

12000

Placing dry floors DRY WALLS

М2

1800

Figured tile cutting

RM

2300

Facing the floor with ceramic granite

M2

3000

Leveling floors with "levelers"

M2

500

Flooring of commercial linoleum

M2

700

Welding joints of commercial linoleum

RM

450

Additional works

Installation of accessories in the bathroom

Pcs

1000

Installation of ventilation grilles

Pcs

1000

Installation of rectilinear curtains

Pcs

1200

Installation curved curtains

Pcs

2500

Mounting the door stop

Pcs

600

Dismantling works

Dismantling of brick walls (chiselling)

М3

15000

Dismantling of concrete walls (chiselling)

М3

25000

Dismantling of concrete (mortar) screed thickness of up to 5cm

М3/М2

20000/3200

Removing of plaster

M2

800

Making whole in brick (not bearing).

M2

6500

Making whole in a brick (bearing)

M2

14000

Making whole in concrete (not bearing).

M2

15000

Making whole in concrete  (bearing)

M2

28000

Garbage removal without elevator

М3 - floor

3500

Dismantling the window - door unit

Pcs

1200

Dismantling of walls of aerated concrete, gypsum, dry wall. Up to 100mm

M2

1900

Wallpaper removal

M2

200

Eliminating whitewash

M2

350

Linoleum dismantling

M2

150

Dismantle of tiles

M2

600

The placement of niches for radiators in a brick wall

M2

3000

The placement of niches for radiators in a concrete wall

M2

9000

Dismantling the boardwalk

M2

900

Dismantling works with preservation of the material structure

M2

40-50% of construction works

Electric installation work

Complex electrical work for rough premises

M2

3000

Making holes for sockets / switch / and installation

Pcs

800

Wall chasing of brick and plaster walls (section of up to 2.5cm)

RM

600

Installation of machines in the panel

Pcs

15000

Wall chasing of concrete walls section up to 2.5 cm

RM

600

Wall chasing of gypsum and foam concrete walls section up to 2.5 cm

RM

400

Hanging chandelier

Pcs

5000

Installing the spotlights

Pcs

750

Wire / TV cable

RM

300

Power cable wiring 220 volts

RM

300

Cabling and box installation

Pcs

500

Installation of pin-up lamp and lighting fixtures

Pcs

3500

Decorative finish: work with material

Textured plaster for the facade

M2

from 5500

Bayrami production of Kaiser, Mustang, Alina made in Kazahstan

M2

4500

Art painting of walls and ceilings

M2

from 40000

Venetian plaster made in Italy, Israel, Germany

M2

from 5800

3D image from the complexity of work

M2

from 25000

Gilding and brass leaf

RM

5000

Mural (Russia) (the minimum order is 10 sq.m.)

RM

from 60000

Imitation of old and ancient walls

RM

5500

Plaster  Leonardo

RM

4500

Polychrome coating

RM

3000

Furniture and Glass Painting

Pcs

negotiable

Plumbing work

Dismantling the bath

Pcs

5000

Installing the bathtub

Pcs

8000

Toilet seat installation

Pcs

6000

Installation of a washbasin with a cabinet

Pcs

8000

Installing a kitchen sink

Pcs

5000

Mixer Tap Installation

Pcs

3000

Installing the washing machine

Pcs

4000

Wall chasing  for the distribution of sewage pipes and water supply

RM

3000

Manufacturing and installation of metal-plastic windows and doors (White)

M2

From 18000

French stretch ceilings

M2

From 2500 to 4500

Custom-made furniture

RM

from 45000

Garbage removal

Т

3820

Surface cleaning of buildings, premises

M2

from 650

Detailed cleaning of buildings, premises

M2

from 1200

Cleaning nearby territory with equipment

Pcs

negotiable

Stonework

Stacking marble

М2

8000

Granite laying

М2

7000

Laying travertine

М2

7000

Artistic styling of marble

М2

From 12000

Grinding, polishing and crystallization of marble and granite

М2

From 6000

3D and decorative floor

3D grouting and decorative floor

М2

From 25000

Pouring of polymeric and industrial floors (from marble chips)

М2

From 5000

Construction works

Excavation

Breakdown of axes of foundations and elevations

M2

from 400

Developing ground coat manually

M3

from 6000

Cutting of a vegetative layer by the bulldozer up to 250мм

M3

from 2000

Ground development by equipment with loading onto vehicles

M3

from 2000

Transportation of the developed soil to the dump by truck

M3

1700

Development of soil by equipment in the dump

M3

900

Backfilling of soil with layered tamping (backfilling of sinuses)

M3

1900

Arrangement of rubble bases manually with tamping and watering

M3

2500

Arrangement of sandy bases manually with ramming and watering

M3

1300

Concrete and installation works

Concrete preparation

M3

from 5500

Cement-sand screed thickness of up to 50mm

M2

from 2200

Constructional form

M2

from 700

Laying of concrete mix in a structure

M3

from 7000

Installation of foundation blocks

Psc

from 1500

Installation of reinforced concrete foundation pillows

Psc

from 1500

Waterproofing by lubrication

M2

from 600

Installation of floor slabs

Psc

from 5000

Preparation of the solution by hand using a "mixer"

M3

from 4000

Welding of reinforcing bars and metal structures

Т.

from 60000

Hydro-thermal insulation work

Horizontal waterproofing, 2 layers

M2

from 1600

Guided waterproofing, 1 layer

M2

from 800

Guided waterproofing, 2 layers

M2

from 1600

Vertical waterproofing, 2 layers

M2

2500

Plastering horizontal waterproofing,  2 times

M2

700

Plastering vertical waterproofing,  2 times

M2

900

Waterproofing from a polyethylene film, 1 layer

M2

150

Installation of extruded polystyrene on a vertical surface of up to 50 mm thick

M2

1000

Installation of extruded polystyrene on a horizontal surface

M2

500

Stonework

Wall masonry with claydit or gas block with a thickness of 300mm

М3

from 6500

Wall masonry with claydit or gas block with a thickness of 200mm

M2

from 2300

Wall masonry with claydit or gas block with a thickness of 100mm

M2

from 2000

Brick masonry of walls from 380 mm

М3

from 9000

Masonry of brick columns 380 * 380mm

RM

from 10000

Masonry made of cladding brick

M2

from 5500

Masonry partitions 1 / 2 brick

M2

from 2500

Laying the insulation in an efficient masonry

M2

400

Masonry of external walls made of bricks with insulation and facing brick (380 + 100 + 120)

M3

from 13500

Masonry of external walls made of bricks with insulation and facing brick (510 + 100 + 120)

M3

from 14000

Masonry of external walls with claydit or gas block with facing brick (300 + 120mm)

M3

from 14500

Masonry of external walls with claydit or gas block with facing brick (400 + 120mm)

M3

from 14500

Masonry of external walls with claydit or gas block with facing brick (500 + 120mm)

M3

from 12000

Masonry of external walls with claydit or gas block thickness of 200 mm with matting - 100, air drain -50mm and siding as facing 120mm (200+100+50)

M3

from 14000

Siding installation

M2

2800

Wall cladding with natural stone

M2

from 4000

Installation of lintel blocks of reinforced concrete

Pcs

550

Facing facade with travertin

M2

from 6000

Roofing

A roof from metal (timber construction, a lath, a flooring of a metal tile)

М2

from 3000

The construction of the roof of soft tiles (rafter constructions, counter lath, even lath, installation of tiles)

М2

from 4500

Roofing with stainless steel sheet (rafter constructions, lath, stainless steel sheet installation)

М2

from 3800

Matting of the attic floor (steam-insulating works, insulation, hydro-wind protection)

М2

from 1000

Matting of the attic roof (steam-insulating works, insulation, hydro-wind protection)

М2

from 1000

Installation of rafter construction

М2

from 3000

Installing the counter cladding

М2

1000

Mounting the wall plate

RM

from 1200

Mounting of continuous cladding

М2

from 1800

Installation of vapor barrier

М2

180

Installation of moisture-and-wind insulation

М2

350

Installation of a basalt insulation with a density of 35-50 kg / m3 in the inter-rafter space

М2

900

Installation of metal tile

М2

from 800

Installation of flexible tiles

М2

from 2500

Installation of the cornice binder (width from 100 to 500mm)

RM

from 2000

Installation of drainage system (at a cornice height of up to 6 m)

RM

from 1500

Mounting of passages for pipes and fans

RM

from 4000

Installation of attic windows

M2 From 15000
Repair and restoration works

Repair and restoration works of cultural and historical monuments

(Depending on the author's assignment)

Pcs

negotiable

Partial restoration of facades, roofs (architecture)

М2

From 35$

High-altitude work and industrial climbing

Hydrojet cleaning of metal structures

М2

from 1080

Mechanical cleaning of metal structures

М2

from 520

Application of primer

М2

from 540

Surface painting by airless method (m2 - 1 coat of paint)

М2

from 700

Coloring the surface with a hand tool (m2 - 1 coat of paint)

М2

from 1200

Full anti-corrosion paint

М2

from 3000

Welding works

Pcs

договорная

Mechanical cutting of metals at high altitude

Pcs

договорная

Gas cutting of metals at high altitude

Pcs

договорная

Drilling holes in metals (pcs.)

Pcs

договорная

Complete sealing of inter-panel seams

RM

from 780

Integrated sealing of windows

RM

from 900

Opening of the old sealant

RM

from 300

Opening of cement mortar

RM

from 300

Degreasing the surface

RM

from 500

Removal of mold and fungus

RM

from 750

Stacking insulation

RM

from 225

 Installing the hydraulic lock

Pcs

from 2000

Application of sealant

RM

from 420

Complete cleaning of the roof (high pressure washing)

М2

from 680

Trimming of gutters

RM

1320

Cleaning large debris

М2

1030

Washing of vertical glasses

М2

from 300

Cleaning of horizontal glasses

М2

from 410

Cleaning of hard-to-reach glasses

М2

from 540

Cleaning of heavily soiled glass 1 (meter2)

М2

from 500

Cleaning of especially dangerous glasses 2 (sq. m.)

М2

from 850

Cleaning of the facade by hand (smooth and slightly soiled surfaces)

М2

from 460

Washing the facade with a high-pressure cleaner

М2

from 560

Washing of the facade with acid-alkaline agents

М2

from 1350

Sandblasting

Cleaning of metal surfaces

М2

From 2500

Cleaning of production premises

М2

From 3000

Cleaning of tanks and pipes

М2

From 1800

Joomla Plugins
FaLang translation system by Faboba